SINAMICS PM260 6SL3225-0BH33-0AA1 power module

Evidence-backed SINAMICS PM260 power module for SINAMICS G120 motor drive systems.

System function and position

Rebuilt from individual evidence

Siemens documentation identifies 6SL3225-0BH33-0AA1 as a SINAMICS PM260 power module.

The cited documentation records 6SL3225-0BH33-0AA1 with 37 kW low overload and 30 kW high overload for three-phase 500-690 V AC input with 400/480 V output rating.

The product documentation places 6SL3225-0BH33-0AA1 in the SINAMICS G120 power-module family for SINAMICS G120 motor drive systems.

Exact reference
6SL3225-0BH33-0AA1
Category
Drives / VFD
Evidence checked
2026-09-12

System role

This section explains what the product does and where it acts in the surrounding system.

Function
Converts three-phase electrical input into controlled output for the motor.
System position
Sits between the three-phase supply and the motor in the drive system.
Upstream / inputs
Accepts the documented three-phase electrical supply at its input terminals.
Downstream / outputs
Supplies controlled electrical output to the connected motor.
Limitations
Unknown: Motor compatibility, site wiring, environmental fit, and current commercial availability require separate checks.

Evidence ledger

Facts, inferences, and unknowns are kept separate.

Facts

  • Siemens documentation identifies 6SL3225-0BH33-0AA1 as a SINAMICS PM260 power module.

    Confidence: high

  • The cited documentation records 6SL3225-0BH33-0AA1 with 37 kW low overload and 30 kW high overload for three-phase 500-690 V AC input with 400/480 V output rating.

    Confidence: high

  • The product documentation places 6SL3225-0BH33-0AA1 in the SINAMICS G120 power-module family for SINAMICS G120 motor drive systems.

    Confidence: high

Inferences

  • The documented function places 6SL3225-0BH33-0AA1 between the incoming electrical supply and the motor in the drive system.

    Confidence: medium

    Rationale: The product documentation identifies the device type and its electrical input/output role, which supports this system-position inference.

Unknowns

  • Unknown: Motor compatibility, site wiring, environmental fit, and current commercial availability require separate checks.

    Confidence: low

    Missing evidence: Motor compatibility, site wiring, environmental fit, and current commercial availability require separate checks.

System position diagram

Block diagram showing the 6SL3225-0BH33-0AA1 between a three-phase supply and a controlled motor.

Reading limit: system position only, not a wiring or safety drawing.

System position: the converter sits between the three-phase supply and the controlled motor.

Enlarged system diagram

Block diagram showing the 6SL3225-0BH33-0AA1 between a three-phase supply and a controlled motor.

System position: the converter sits between the three-phase supply and the controlled motor.

View Mermaid source
flowchart LR
  supply[Three-phase supply] --> drive[6SL3225-0BH33-0AA1]
  drive --> load[Controlled motor]
View diagram labels
Nodes
Three-phase supply; 6SL3225-0BH33-0AA1; Controlled motor
Edges
Power enters the converter; Controlled output drives the load

Next action

Use this power module only after checking the cited electrical ratings, interface configuration, and installation documentation.

Confirm the motor, supply, enclosure, and control requirements against the current Siemens documentation before selection.

Request help with this reference

Request help with this reference

Provide the exact reference, machine context, and observed symptom so the next review can stay evidence-based.

Submission is unavailable until durable storage is verified.

Recovery request details
Add context only if useful
Optional updates
Recipient and data disclosure

Recipient and data disclosure

Named recipient: Ardkor human-qualification queue (internal local preview). No partner delivery is enabled here.

Data retained for this review: reference, selected route, location, technical context, contact details, consent state, and any accepted private attachment.

Response expectation: none is promised. If external routing is enabled later, the partner name, disclosed fields, and response expectation must be shown and accepted again.

Withdrawal and deletion: use the private request controls from the receipt to withdraw further processing or request access/deletion. The request remains recorded until the relevant Ardkor systems and any recipient confirm completion.

Read the privacy information before sending. For corrections, access, or deletion help, use the contact page or email reference@ardkor.org; mailbox delivery and attendance have not been verified.

This routing state is separate from watch, marketing, payment, and analytics choices. If no capable service match is found, the request remains a human-qualification lead and is never presented as provider acceptance. Ardkor is not an emergency or safety service and submission does not guarantee availability, price, repair, sourcing, or response.