Siemens 6SL3353-1AG41-2FA0 SINAMICS replacement power block for a Smart Line Module

The captured listing identifies 6SL3353-1AG41-2FA0 as a SINAMICS replacement power block for a Smart Line Module rectifier. The listing gives a 600-690 V three-phase supply context, 50/60 Hz, and a 1200 A current rating.

System function and position

Rebuilt from individual evidence

The captured listing identifies 6SL3353-1AG41-2FA0 as a SINAMICS replacement power block for a Smart Line Module rectifier.

The listing gives a 600-690 V three-phase supply context, 50/60 Hz, and a 1200 A current rating.

Sits in the Smart Line Module rectifier power stage between the three-phase supply and the SINAMICS DC link.

Unknown: installed topology, wiring, firmware, unit condition, and replacement compatibility for 6SL3353-1AG41-2FA0 require separate evidence.

Exact reference
6SL3353-1AG41-2FA0
Category
Drives / VFD
Evidence checked
2026-09-12

System role

This section explains what the product does and where it acts in the surrounding system.

Function
Converts high-current three-phase line power in the SINAMICS Smart Line Module stage.
System position
Sits in the Smart Line Module rectifier power stage between the three-phase supply and the SINAMICS DC link.
Upstream / inputs
Receives the documented 600-690 V three-phase line supply at 50/60 Hz.
Downstream / outputs
Supplies rectified drive power toward the downstream SINAMICS DC link.
Limitations
Unknown: installed topology, wiring, firmware, unit condition, and replacement compatibility for 6SL3353-1AG41-2FA0 require separate evidence.

Evidence ledger

Facts, inferences, and unknowns are kept separate.

Facts

  • The captured listing identifies 6SL3353-1AG41-2FA0 as a SINAMICS replacement power block for a Smart Line Module rectifier.

    Confidence: medium

  • The listing gives a 600-690 V three-phase supply context, 50/60 Hz, and a 1200 A current rating.

    Confidence: medium

Inferences

  • Inferred system position: Sits in the Smart Line Module rectifier power stage between the three-phase supply and the SINAMICS DC link.

    Confidence: medium

    Rationale: The exact product description and documented operating context establish this system placement.

Unknowns

  • Unknown: installed topology, wiring, firmware, unit condition, and replacement compatibility for 6SL3353-1AG41-2FA0 require separate evidence.

    Confidence: low

    Missing evidence: The individual lookup does not establish the installed topology, wiring, firmware, unit condition, or replacement fit.

System position diagram

A flow from the upstream system through 6SL3353-1AG41-2FA0 to the downstream drive system.

Reading limit: system position only, not a wiring or safety drawing.

Sits in the Smart Line Module rectifier power stage between the three-phase supply and the SINAMICS DC link.

Enlarged system diagram

A flow from the upstream system through 6SL3353-1AG41-2FA0 to the downstream drive system.

Sits in the Smart Line Module rectifier power stage between the three-phase supply and the SINAMICS DC link.

View Mermaid source
flowchart LR
  upstream["Upstream system"] --> item["6SL3353-1AG41-2FA0"]
  item --> downstream["Downstream drive system"]
View diagram labels
Nodes
Upstream system; 6SL3353-1AG41-2FA0; Downstream drive system
Edges
Documented input path; Documented output path

Next action

The captured evidence supports the documented system role for 6SL3353-1AG41-2FA0.

Unknown: installed topology, wiring, firmware, unit condition, and replacement compatibility for 6SL3353-1AG41-2FA0 require separate evidence.

Request help with this reference

Request help with this reference

Provide the exact reference, machine context, and observed symptom so the next review can stay evidence-based.

Submission is unavailable until durable storage is verified.

Recovery request details
Add context only if useful
Optional updates
Recipient and data disclosure

Recipient and data disclosure

Named recipient: Ardkor human-qualification queue (internal local preview). No partner delivery is enabled here.

Data retained for this review: reference, selected route, location, technical context, contact details, consent state, and any accepted private attachment.

Response expectation: none is promised. If external routing is enabled later, the partner name, disclosed fields, and response expectation must be shown and accepted again.

Withdrawal and deletion: use the private request controls from the receipt to withdraw further processing or request access/deletion. The request remains recorded until the relevant Ardkor systems and any recipient confirm completion.

Read the privacy information before sending. For corrections, access, or deletion help, use the contact page or email reference@ardkor.org; mailbox delivery and attendance have not been verified.

This routing state is separate from watch, marketing, payment, and analytics choices. If no capable service match is found, the request remains a human-qualification lead and is never presented as provider acceptance. Ardkor is not an emergency or safety service and submission does not guarantee availability, price, repair, sourcing, or response.